image

PoT 2014 - PuristS members visit the Zenith Manufacture (ii/ii)

Ornatus-Mundi
Avatar
Some time back Elio and myself published the first instalment of the 2014 PuristS-on-Tour trip to Zenith, covering the ‘primary production’ at the fully integrated manufacture: click here !

none


With this final instalment we will guide you through those sacred departments who do the final assembly and regulation of all Zenith watches, and that are responsible for quality control (a process that is integrated alongside the entire assembly procedure).

At the end of the primary production steps , Zenith has the components of any watch of its collection available, movement blancs, cases, hands or rotors. Most of those are made in-house, whereas some come from outside specialist supplies such as cases, hands or dials (see our PoT report on the Fehr S.A. dial maker: click here (parts i & ii) and here (parts iii & iv)).

none

none


In order to minimise revisions, repairs and rejections right from start, all components, be they in-house or externally sourced, are rigorously tested by a specialist quality control department located in a dedicated workshop:

none


none


Inspections my involve checking of critical measurements against spec sheet data…

none


none


… and/or for optical perfection.

none


none


Only after successful completion of these inspections parts are cleared for assembly - with a personal signature on each satisfactory batch. 

none


Assembly means very different steps. Of the very basic ones Zenith executes is the putting together of singular parts into functional units, a task executed in a separate atelier:

none


none


The image above shows an automatic ruby setting machine. The robot precisely sets rubies into their designated places of – in this case – a Zenith El Primero movement bridge.

none

Other units are put together by hand, such as these chronograph levers. To the left you see raw levers; to the right you’ll notice two pins which have been friction fit. 

none


This is result of concentrated handwork using precision jigs.

none


Having completed the critical evaluation, all preassembled components of a movement are now ready to be completed into a fully working El Primero movement:

none

How subsequent assembly steps are implemented depends highly on the complication grade of the final watch. Consistent with the difference in finishing, assembly is also divided: whereas the haute horlogerie pieces, i.e. the Academy watches, tourbillons and the like, are individually completed by highly qualified watchmakers, the less complicated watches are finished in an assembly line arrangement. 

We will visit the latter atelier first. As you can see, PuristS spent a bit too much time with the other departments, thus quite a lot of the workforce was already on its way home when we finally arrived here ;-). Nevertheless, still sufficient people to tell the story!

none


The most interesting object here is the advanced technology that is integrated into the ‘etablis’: cassettes holding batches of movement plates are fed into a receptor. Movements are automatically retrieved and placed on a band at the front of the desk. A translucent glass covers the line, protecting the blanks from dust but allowing the technician to inspect what is happening there.

none

At the ‘work station’ an opening allows access to a single movement. 

none


If needed the movement can be lifted up to facilitate access.

none

After the watchmaker completed the respective step, the movement travels further and is finally placed into its designated seat in a cassette. Once the cassette is full, it can be taken and handed over to the next work place. This way assembly is made more efficient, safe (protection of movement) and clean (protection from dust).

none

In the atelier for complicated watches the atmosphere is entirely different. 

none


Producing masterpieces like those…

none


… is much more demanding and requires a lot of skill and expertise – quite obviously:

none


Concentration and dedication transpires, to the extent that we were not noticed at all – by some:

none


What is striking is the additional amount of handwork and traditional tools which characterises the workflow here. At the end, an almost finished movement is created, still without rotor - as this part impedes with ease of regulation:

none

What follows now is the last step to be executed on the movement directly - its regulation: 

none


none


Completed movements are checked for accuracy and precision in batches. The performance of each movement can be measured and recorded individually. 

none


A Zenith watch finally takes shape! 

none


Now, with the movement finished, its high time to add some spice – here in form of the dials…

none


… and the hands. Now, hands are not just pointers. They have inserts, complex shapes; amongst them their inclination towards the outer rim of the dials in order to facilitate reading of time.

This inclination is not applied at the hand maker’s. In fact, this is done manually at Zenith. We were treated with a demonstration:

none


Here we see a craftswoman carefully rolling a rod over the tip of a hand. As the surface she uses is rather soft, the hand bends upwards, resulting the in the slight inclination:

none


none

Now, the hands are mounted on the movement using staking tools, each one for a different han:

none

Finally, our movement is ready for its marriage to case and dial:

none

The very last step now involves the mounting of the rotor… 

none

none
.. and encasing of the watch!

none


none


You'll notice that PuristS tend to get more nervous alongside completion status of the watch...

none


Almost finished: encasing and closing of the case back:

none

And there is a result!

none


But Zenith is not content with this state. Two very crucial examinations are to be passed: As a fully integrated chronograph manufacture the company takes pride its El Primero movement, and thus it comes with little surprise that particularly the chronograph is tested thoroughly – in its case. This is of crucial importance since here movement, case and pushers act together, requiring a control after final assembly. 

none


For this, Zenith has devised a special machine programmed such that a typical usage scenario is simulated (see above):

none


Second, Zenith requires, like other manufactures, a pressure test to assure water resistance:

none

Only after passing these tests, Zenith watches are declared completed, and straps are mounted:

none


After a final inspection, the watches are sealed in gum wrap and assigned a lot number for further tracking (effectively, being recognised as a Zenith entity):

none


Straps are attached…

none

The newborn Zenith watch is now ready to be shipped. A new owner, a new love, but certainly tremendous new pleasure!

For us PuristS the tour, technically, has come to its end. It was a great honour to be taken that deeply into the innards of one of the most respected and acknowledged manufactures. Proudly we put down our names in the Golden Book of the brand:

none


none


So, with two last images which perfectly exemplify how presence and past a equally cultivated at Zenith, we leave with lots of new impressions, and fascination. 

none

none

No, another treat for us, in fact, many… See next post!

none


  This message has been edited by Ornatus-Mundi on 2015-03-16 01:09:52

Comments:
Avatar
Ornatus-Mundi March 15th, 2015-04:10
Zenith got us PuristS *certified*, and made us drool one last time ;-) Refreshments were offered (and well needed) after this exhaustive and intense visit. The real surprise for us await us after refreshments in the Zenith lounge downstairs: Zenith's Director of Hospitality, Mr Paul Wirth, got us certified : And this is the ... 
Avatar
Ornatus-Mundi March 15th, 2015-08:01
Culinary delights and a "PuristS must-do"... Now, it was almost evening: our mind already started spinning like the "Gravity Control" gyroscopic module and our hearts sped up beating like the "El Primero". Yes, the enthusiasm and the authentic gratitude for the Manufacture were absolutely at the top... 
Ophiuchus March 15th, 2015-18:06
Excellent post. Thought I noticed a little something in your sixth picture down. The tool that woman was using looked familar: It's not a tool people are used to seeing. I have never seen one on PuristS before, and I have one :) She was using a Cary comparator micrometer, a specialized quick-lever set micro... 
Avatar
Ornatus-Mundi March 16th, 2015-09:26
Fascinating information - what do you conclude about this? Is it that other companies do not apply the same intensity/coverage in parts control, or do you think the tool is used to be mobile and apply controls where needed (it appears to me quite flexible). Thanks, Magnus
Ophiuchus March 16th, 2015-18:38
Flexibility would be my guess. Zenith's QC department looks extremely well equipped, and serious about what they are doing. I could say the same about many large companies though. But this is a good thing. There are far more exotic ways of measuring parts- CMMs and optical profilers co... 
Avatar
Ornatus-Mundi March 17th, 2015-13:56
Thanks again - "great for checking values quickly from a standard size" that appears to be exactly the use at Zenith. Thanks for enlightening us on this matter! Best, Magnus P.S.: More pictures or rare tools - sure, if I find (and identify) them!
Avatar
ED209 March 15th, 2015-20:20
Thanks for the report on the Zenith Tour Great photos, looks like everyone had great time. Did you take home a Zenith watch as a souvenir from the trip? Regards, ED-209
Avatar
Ornatus-Mundi March 16th, 2015-09:30
Would you buy a new watch in a company's 149th year ;-)?  
Avatar
ED209 March 16th, 2015-09:42
Sure why not? :) A new watch now as a souvenir to commemorate the trip, and as a placeholder for the special one for the 150th! :) Regards, ED-209
Avatar
Ornatus-Mundi March 17th, 2015-13:56
THAT sounds like a good plan!  
0-10-10

Load More Comments




 Next Article
image
Ornatus-Mundi
Avatar

Zenith Coffee House Tales (xii): El Primero 36’000 VpH Volcano

Ornatus-Mundi
Avatar
In this new instalment of the traditional Zenith Coffeehouse Tales I would like to present to you another very tasteful specialty, the Zenith El Primero 36’000 VpH Volcano : Part of the 36'000 VpH collection, this model comes in the traditional 42mm steel case with some very individual clothes: First and foremost, there is the anthracite-coloured dial with its red gold accents (tachometer scale, indices, subdials and hands). A closer look reveals that Zenith opened up the stage for a dramatic interplay of ... .


Go to top.

About US | Contact

© 2017 - WatchProZine